Weekend update 2 – appliance decisions and other stuff

A bare bones update – more of a list of things that I have decided on or need to finalize with Paul tomorrow morning.

New London Style Pizza is waiting – so this is going to be fast

Roofing:

Everlast 24 Gauge Architectural Series – color:  SIERRA TAN

Appliances: – all from the great folks at Hunter Appliance (they were excellent.  They have a very, very good service department so they can really speak to how well does a product install, run and service.  Reliability is important to me so we oriented that way and did a lot of mix and match of manufacturers).  Many, many thanks to my salesman Howie – he really took the time to listen and took the time to explain why he was recommending each item.

  1. GE built in single wall oven.  Model JT3000SFSS  (in chrome)
  2. GE Profile microwave (to go with the wall oven)  model PEB7226SFSS  (in chrome)
  3. GE Trim kit for the microwave to match the oven   model JX72230FSS   (in chrome)
  4. Bosch 500 series dishwasher, pocket handle, with 3 racks (24″)  model SHP65TL5UC   (in chrome)
  5. KitchenAid 22 cubic foot, 33 inch full depth refrigerator.  Right hand hinge door    model KRBR102ESS  (in chrome)
  6. KitchenAid 30″, 4 element cooktop with central down draft ventilation.  This was not onsite when we were there – they had just sold their last one.  However, this link here shows basically the same thing.   model KECD807xBL   ( all black – no chrome surround)
  7. SpeedQueen washing machine – top loader  – not sexy or elegant but the only choice if you want reliable AND a top loader according to Hunter.  They said it is this or go European front loader.  Model  AWN432SP113TW0  (white)
  8. SpeedQueen electric dryer – the reliability matched pair  🙂   model ADE3SRGS173TW0   (white)

Plumbing Fixtures (bathroom and kitchen).

Paul really recommended Symmons as very good value for your money.  I went to their sight online and like the styling just as well as the Kohler that I had previously bookmarked – so I have replaced Symmons items when their is a product line match with Kohler (Kohler does a lot of extra things as well like sinks)

  1. Symmons ORIGIN series for the bath
    1. single handle lavatory faucet – one for each bath  – model S-9612-1.5 in chrome
    2. Origins Tub/Shower/Hand Shower system for the guest bath – model 9606-PLR  in chrome
    3. the master bath is going to have a walk in shower and I want a rain system as well as a regular hand shower system – I am unsure of the mix and match up – but the rain shower head I am looking at is the 12″  2.5 gallon per minute Symmons   – in chrome
  2. Symmons ORIGIN series for the kitchen
    1. Single handle faucet with separate sprayer.  Model S-23-3  in chrome
  3. Kohler bathroom
    1. San Raphael elongated toilet (concealed trapway, gravity flush, elongated bowl and 1.6 gallons per flush).  Model K-3466 in white
  4. Kohler kitchen
    1. Kohler undermount single sink – a system really with an elegant stacking system – expensive but practical.  Model K-5540

Other stuff to talk to the electrician about tomorrow morning

Light switches – rocker switches seems to be the way everyone is going these days.  Some interesting advances here

Hallway and other public locations switches

  1. Hubbell Wiring RSD115ILW tradeSelect® Illuminated Two Position Decorator Quiet Switch  – this is a rocker switch that when turned off, also functions as a night light – so you can find the switch in the dark.  This would be annoying in your bedroom but great in the hallway, bathroom and the public spaces of the house
  2. Wiring the living room for ceiling lights and fan(s).  I am worried it will get very hot at the top of the ceiling (I am not sure where the make up air intake will be for the furnace?).   Lighting up there will be some sort of track lighting.   As far as fans go – I am looking at these:  the Big Ass Fans,  Haiku series – in polished aluminum
  3. For electrical outlets & random stuff – that will be a discussion with the electrician – but I, if possible my “would like to have” list of things and other randoms is below
    1. 4 way receptacles – since every wall receptacle seems to instantly acquire a power strip to be able to service more items
    2. flood lights outside
    3. external power receptacles in the car port (garage side)
    4. some capacity for network Cat6 cabling
    5. a home base for electronics in the garage or pantry?  aka – server room
    6. in floor receptacles scattered across the great room.  Like the Hubbell SystemOne Floor boxes for wood floors.
    7. the potential to run multiphase power in the garage for MIG welding using medium duty welders

 

Finally – cabinetry

Paul has two designers and I like portions of each one of their designs – but the change from a ventilation hood to a down draft system has created possibilities – I have some ideas that I want to discuss for the cooktop island.  I am bringing a copy of my book Atomic Ranch – mid century interiors to the site tomorrow 

Posted in Construction progress, Deck House project 9961 | Tagged | Leave a comment

Construction update – a weekend of decisions

My first full weekend back in Carlisle for awhile and lot has gotten done

My Mom, Dad and I went over to the job site on Saturday morning – Paul and his family were there as well as the plumber (brain lock on my part – his name has slipped my mind, despite shaking hands with him several times – sorry!).

Paul and I reviewed the progress so far – which has been great.  NSTAR has been fiddling around but should be able to run power in the next few weeks.

On the house itself, the roof trim is all up and the mahogany oil stain looks fantastic.  It is a three coat process and there is a definite difference between coat #2 and #3 which can be seen in the photos below.  It is a Sikkens product.  Paul explained that he is going to give me a sample / control piece that has been finished with three coats – after three or so years, I will need to bring out the sample and compare colors – where needed, a single new coat will be applied.  As long as I keep on top of it, everything should last a good long while

In terms of decisions

  • we decided on the Sikkens clear oil that will be used for the exterior siding and the tongue and groove ceiling.  It should give a nice variety instead of making the surfaces all blandly the same color.  The team will sand the interior and clean things and after the clear is on, put another top coat on to polish things up (less ability for dust to cling!)
  • In the ceiling area of the carport, we decided on a mahogany luan plywood, with battens to cover the seams
  • We talked about the length of the window seat by the fireplace – the plans call for an 8′ length but we are thinking of extending that so it covers the full window.  More to come there.
  • The fireplace structure is going to be tumbled brick and we agreed on how the chimney front will go
  • We discussed the skylights in the bathroom – manual vs electric.  It turned out that I did not remember correctly the design I had picked out – I went manual on the factory release but had forgotten.  We are going to proceed that way for now
  • Additionally – we discussed whether or not we should add a cap/flashing to the butt end of the ceiling beams by the clerestory windows.  The butts are vertical/flush cut and are going to be exposed to a lot of sunlight and I have been worried about the wood checking and cracking.  Paul rubbed his chin and started to think about water.  We might add some copper flashing as a cap around each beam.  I think it could actually look pretty good – and as Paul pointed out, that replacing those beams would require removing a large section of the roof and that would not be fun.  More thought needed here!
  • And I keep remembering things – we also discussed what color to paint the PVC sprinkler system pipes.  We definitely want to do that before they mounted.  I am unsure.  One way to go would be to go black and let them visually disappear – the other would be a mechanical color.

Next steps are that I meet with Paul and the electrician on Monday morning.  Paul is looking for final decisions on a number of items – so I have been working on them.  These are –

  1. Final decision for the roof color
  2. decision for kitchen appliances and ventilation – or more specifically the size of the cook top and the ventilation structure
  3. fixtures/trim kits for the plumbing
  4. electrical outlet locations
  5. Ceiling fans discussion with the electrician

To keep this post of a reasonable size, I will do a new post with the appliance & roof color decisions

Below is are photos from yesterday’s visits (we went over twice)

Posted in Construction progress, Deck House project 9961 | Tagged | Leave a comment

Short construction update after a lot of business travel

I just got back last night from San Francisco where we had our annual Disaster Recovery exercise and our next year strategic planning offsite (sort of heel to toe on those) – however, both went really, really well so the lack of sleep was definitely worth it.  I have been laying low today (plus it is on and off again drizzling here)

Paul and his team have been making progress however and we went over to take a look.

Upcoming is the final decision on the metal roof color, the hood over the kitchen cooking surface and the brick work for the fireplace.  As far as roof color goes, the roof manufacturer is Everlast Roofing and I really like the Brite White.  It looks good, will have the minimum heat loading and will match the barn next door – so very site specific

I haven’t figured out the cooking hood yet but the brick looks great.  Paul and I just need to confer and keep him on track 🙂

Posted in Construction progress, Deck House project 9961 | Tagged | Leave a comment

Construction update – going up fast!

My parents and I stopped by the construction site today after stopping off at the Transfer Station and dropping off the recycling and trash.  Great day, great weather!

Paul and his team are going along great – hopefully soon NStar will show up and run electrical power up to the house so they can stop using a generator for power.  They are doing a fantastic job and the house is really taking shape – my Mom said that it is just “floating there” (when looking at it from across the mill pond) and I think she is right.  With the complex roof lines, I was really hoping for something that was open, airy and uplifting – not a hulk squatting on the lot.  Nothing is done till its done, but it is looking good!

Speaking of Rumford style fireplaces – what is a Rumford anyway?  In short it is fireplace that is designed to maximize the infrared radiation (aka – the actual heat from a fire) out to a room.  The way it does this is by having flat sides and a very shallow and open hearth.  To keep the fire drawing well and not smoking up the room, the chimney/flue design is much like a smooth wind-tunnel.  The top-front of the fireplace (below where the mantel is normally) is a smooth internal airfoil.  As the hot air rises, the airflow is smoothly accelerated there and keeps the smoke flowing up the chimney.  There are other effects like induced turbulence in the flu to increase burning of gases etc… – but that is basically it.  Measurements on some fireplaces have the temperature at the front top of the fireplace at 72 degrees while it is hundreds of degrees hotter only a foot deeper in the hearth.

Here is a classic photo of the design

and more technical details on how it works

So who thought this all up?  A native son of Massachusetts – Count Rumford.  He started writing up his ideas and plans for this type of fireplace in 1796.  Count Rumford was born Benjamin Thompson in Woburn MA in 1753 and was given his title in Bavaria where he spent the Revolutionary period (he was a Loyalist and Woburn is only a few miles from the Lexington and Concord revolutionary battle fields).  His writings are very interesting, even today.

While I have probably seen a Rumford design in older houses before, I have not ever been able to build a fire in one.  I heard about the design from the This Old House 25th anniversary show, which rebuilt a house about a mile from my parents place in Carlisle – they put one in.  Programs 2410 and 2411

So – this fall should be fun to experiment with different fire building strategies to see what works best

http://www.rumford.com/index.htm

http://superiorclay.com/fireplace-firebox-design/rumford-fireplaces/

Posted in Construction progress, Deck House project 9961 | Tagged | 1 Comment

Construction update – roof trusses arrive

A brief gap in the updates on the construction front while I had some business travel to California and Paul awaited delivery of some of the roof trusses.  Paul however made progress with getting NStar/Eversource rolling for running electrical power to the house – that should be happening “soon”.  The contact and initial jousting over schedules has happened – so hopefully not too long for that.

The trusses arrived and they are very interesting.  Part of the plan for this house was to not do a Deck roof throughout the entire space of the house and garage.  A Deck roof is a very specialized structure – adapted as the name implies – from house decks, and performed by only some special roofers newcastle.  Without going deeply into the details, most of which I am not expert in, what you see from the inside is a cathedral ceiling with massive beams and tongue and groove cedar planking.  This allows for really open spaces and lots of wood to be shown.  For a different feel (and lower cost) Deck also has a truss based roof system.  I chose to utilize that for the mechanical and private areas of the house – I am hoping that this will give the public and private parts of the house two very different feelings or vibe.  (note – there is also a different truss system for the floor shown in some of the earlier photos here – allowing for very easy wiring.)

The construction of the trusses themselves is interesting.  They are nailed together with standard carpentry nails through galvanized metal plates – gang nail systems.  I had not seen these before and I did a little digging – they seem VERY strong and apparently houses in south Florida that were constructed with them survived hurricane Andrew much better than those which were not.

Truss connector plate close up - from Simpson Strong Tie website

Truss connector plate close up – from Simpson Strong Tie website

The plates are pierced and form lots and lots of “nails” – so you get a flat surface that has connection to the wood below – across its whole face.  Then you use a half dozen carpentry nails for that deep connection.  It seems like both a very strong and fast way to build a truss

Trusses have arrived and are unpacked. These cover the mechanical space and the bedrooms. A complex and interesting design while still being cost effective. Note the flat plates - these are the connector plates that make the trusses much more affordable AND strong. According to the wiki page on the inventor of this technology, houses built in Florida with these connectors were much more likely to have survived Hurricane Andrew. https://en.wikipedia.org/wiki/John_Calvin_Jureit

Trusses have arrived and are unpacked. These cover the mechanical space and the bedrooms. A complex and interesting design while still being cost effective. Note the flat plates – these are the connector plates that make the trusses much more affordable AND strong. According to the wiki page on the inventor of this technology, houses built in Florida with these connectors were much more likely to have survived Hurricane Andrew. https://en.wikipedia.org/wiki/John_Calvin_Jureit

In some of the earlier photos, you may have noticed the big orange machine in the background – that is Paul Heberts’ Lull Telescopic Lift machine – a key piece of equipment on a Deck House building project from the looks of it.  It handles the majority of the heavy work related to taking the flat pack materials from the factory and placing them around the site and for final assembly.  My dad happened to capture a series of shots placing a truss.

The trusses are now all in place I believe – or really, really close to being done – so some interior shots below – you can really start to see how it is coming together now.  Fantastic progress since June when it was just a hole in the ground waiting for a foundation.

Some design thoughts : 

From what I can tell, the house tends to get a fair amount of breeze from the south due to the lay of the land. The south facing glass has more sections that open – so the house is asymmetric in terms of volume and location of openings – my thinking during the design phase is that this might induce a venturi effect when the wind is not blowing strongly – in other words, it will act like a wind sock in low wind speed conditions – the large opening moving to a small. This should generate a compression acceleration of the air speed, creating a proverbial “ahhh – a nice breeze” on day that would normally be considered low wind or even stuffy.

I am starting to think about a post that ties together the design thought process I went through and how it is turning out in reality – maybe even a series of posts with a separate category from “construction”….  hmmm….  🙂

Posted in Construction progress, Deck House project 9961 | Tagged | Leave a comment

Blacksmith work at Fohlfield and house update

My brother Jeff, SiL Meghan and nephews Mason (8 yrs) and Owen (1.5 yrs) have been visiting for about 2 weeks now and we have been having a fantastic great time with some good adventures too.

Yesterday it was a bit cooler so we warmed up the coal fired forge and Mason crafted his first piece of iron.  He is now officially an apprentice Blacksmith!

For the first project, my Dad and I decided on something that could be used around the house, showed off a few different but straight forward techniques and would be relatively quick to complete – we decided on page holder for cookbooks.  Basically an iron bar with some subtle curves in a very flat U shape and fingers to hold the pages.  The bottom of the U sits on the counter above or below a book that is flat and open.  The fingers are laid on top of the book and are far enough from the spine to be able to easily hold down the pages without hurting the book.

We took a raw 1/4″ mild steel rod, flattened and shaped it with multiple heatings in the coal fire. Mason did all the hammering, a whole bunch of the pumping of the forge blower (forced air through the coal fire) and the wire brush clean up.

We taught him how to check for heat over hot metal, see what clinkers are  (used up iron oxide – not good for heating things since they are used up – but very neat to look at), eye protection and how to use the drill press with the power wire brush (to clean off the forge scale at the end)

Here is Mason with the cookbook holder he made with Uncle Nick and Grandpa Fohl today over the old coal forge and anvil.  The anvil came from a barn sale several decades ago and is over 100 years old.

Grandpa Fohl and nephew Mason showing off the cookbook page holder we just completed for my SiL. Mild steel

Grandpa Fohl and nephew Mason showing off the cookbook page holder we just completed for my SiL. Mild steel

Unfortunately, we were too busy DOING to take pictures while we were making it.  But lots of orange hot metal and hammering.  If you have never seen what that looks like, below are a number of older ‘in progress’ shots for illustration purposes.

The forge setup in winter. This tends to be a bit more comfortable than working in late July.

The forge setup in winter. This tends to be a bit more comfortable than working in late July.

Flat bar stock at orange heat on the end - the technique we used on Mason's cookbook holder. You heat up the section you want and hammer it quickly while it is soft, before it starts to cool and harden back up. "Strike while the iron is hot!" comes from this saying.

Flat bar stock at orange heat on the end – the technique we used on Mason’s cookbook holder. You heat up the section you want and hammer it quickly while it is soft, before it starts to cool and harden back up. “Strike while the iron is hot!” comes from this saying.

Crafting a Mobius Strip - steel at orange heat temperature all the way through

Crafting a Mobius Strip – steel at orange heat temperature all the way through

On the house front, it is coming along.  I FINALLY closed this past Friday on my construction loan after what felt like a really slow swim through a lake of molasses.  Cold molasses.  But moving on now!

As you can see from the pictures below, the house is starting to look like a house.  The main beam in the living room is truly BIG – I think it is over 3′ and maybe up to 4′ from top to bottom.  I think it is really starting to look neat

Progress continues forward. In the foreground is the wood/metal shop (aka - the Garage). In the middle ground is the carport and then the front door and living room area

Progress continues forward. In the foreground is the wood/metal shop (aka – the Garage). In the middle ground is the carport and then the front door and living room area

GluLam (Glued Laminate beam) over the carport - a big beam but not the biggest in the house

GluLam (Glued Laminate beam) over the carport – a big beam but not the biggest in the house

The main ridge beam is a BIG beam - for scale, that might be 3 or 4 FEET from top to bottom :-)

The main ridge beam is a BIG beam – for scale, that might be 3 or 4 FEET from top to bottom 🙂

Looking from the living room to the front door

Looking from the living room to the front door

From down slope back up to the living room. Fireplace stack on the left hand corner

From down slope back up to the living room. Fireplace stack on the left hand corner

For comparison, here is what the initial rendering from Deck Acorn House looks like.  This dates from pretty far along the design process so the final design should be very close to be what the house turns out like

This is the sketch of the final house from about 3/4 of the way through the design process. The final house should look very similar to this

This is the sketch of the final house from about 3/4 of the way through the design process. The final house should look very similar to this

Ps – Fohlfield is the old family name for the house on South Street – a cognomen given by Jack Robinson to the family homestead.

Bing Maps using the Bird's Eye view which is made up of numerous aircraft photographic side views - when you rotate the view you get a different picture from the same height - so you get different shadows and sense of perspective - great stuff! www.bing.com

Bing Maps using the Bird’s Eye view which is made up of numerous aircraft photographic side views – when you rotate the view you get a different picture from the same height – so you get different shadows and sense of perspective – great stuff! www.bing.com

Posted in Construction progress, Deck House project 9961 | Tagged | Leave a comment

Further progress on Bedford road

The house is starting to take shape and look like a house

The Santa Rosa Fohls are enjoying their visit to Carlisle and we made a couple of stops over to see how the house is progressing.  Quick & obvious progress as the framing goes up.  I am sure that it will slow down again as the finish work starts – this is all stuff that will be hidden away under the skin when it is completed.

Photos below are from July 9th and 12th

Progress as of July 9th. The walls are starting to go up! Mason checking out the scene

Progress as of July 9th. The walls are starting to go up! Mason checking out the scene

Fast progress!

Fast progress!

Looking at the future bedrooms. Note the floor to ceiling windows that wrap around the corner

Looking at the future bedrooms. Note the floor to ceiling windows that wrap around the corner

Under the bedrooms

Under the bedrooms

The truss system under the living room. This will be covered in foam insulation eventually

The truss system under the living room. This will be covered in foam insulation eventually

Progress as of July 12th - more progressing!

Progress as of July 12th – more progressing!

The future wood/metal shop (aka - the garage). This will have a concrete slab

The future wood/metal shop (aka – the garage). This will have a concrete slab

This will be the core of the house - the utilities and bathrooms - all gathered in one spot for ease of access and construction

This will be the core of the house – the utilities and bathrooms – all gathered in one spot for ease of access and construction

Standing at the future front door looking towards the driveway

Standing at the future front door looking towards the driveway

 

Posted in Construction progress, Deck House project 9961 | Tagged | Leave a comment

A new post – testing the revived subscription function

This is a test post that hopefully will be swept up in the 4:00am automatic sweep for posts in the last 24 hours

fingers crossed!

Posted in Uncategorized | 2 Comments

Santa Rosa Fohls visit Carlisle

Meghan, Jeff, Mason and cowpoke Owen got in late Monday night and yesterday was their first full day in Carlisle.  Very, very hot and humid yesterday and today will be worse before the predicted afternoon thunderstorms arrive – the 70+ percent dew point should drop to the 40% range and it will be awesome tomorrow.

We went and visited the construction site after the crew had finished for the day and they have accomplished a lot – the floor joists look to be 99.9998% installed and the wall systems are onsite already.

I took Meghan and Mason down to Pages Brook and showed them the remnants of the old mill – which already is quite a bush whack.  I only cleared the property a month ago!  My Dad and I have been talking about getting a tractor together that can do other things that his current John Deere cannot do and I am starting to think that may be a good idea – doing hand clearing at my place and on South Street for those hard to reach places could be sufficiently challenging that it gets skipped – and then it is out of control!

Visiting Bedford road construction site.

Visiting Bedford road construction site.

Owen showing off his cowpoke, gunslinger walking style.  "Bending your knees when you walk is for sissies Ma'am"

Owen showing off his cowpoke, gunslinger walking style. “Bending your knees when you walk is for sissies Ma’am”

Floor joists are all in and ready for the underfloor and the wall systems to go up.  Mason showing off some parallel bars moves after sneaking around from underneath

Floor joists are all in and ready for the underfloor and the wall systems to go up. Mason showing off some parallel bars moves after sneaking around from underneath

IMG_0873

In other news, Sarah Williams, who lives in the Old Farrar place, Old Koford place is enlarging and renovating the old Carriage house addition to the house.  The construction crew is tearing out the concrete and putting in a new foundation.  While doing that they cleaned out the ground floor and pulled out an old Myers Self Oiling Water pump and were going to take it to the dump.  My Dad and I rescued it – not sure what the future plans will be but an opportunity for something fun.

A water pump that my Dad and I rescued today.  Sarah Williams, who lives in the old Koford house at the top of the driveway is renovating and enlarging the old carriage house room to make it a larger space and apparently it was tucked in the corner.  The construction crew were going to take it to the dump.  The gear box has multi decade old oil in the sump and it is mounted on a timber sledge.  We dragged it down the driveway with the John Deere and will figure out a plan for it at somepoint.  Possible use it as a sump pump.  It smells of old oil and work.

A water pump that my Dad and I rescued today. Sarah Williams, who lives in the old Koford house at the top of the driveway is renovating and enlarging the old carriage house room to make it a larger space and apparently it was tucked in the corner. The construction crew were going to take it to the dump. The gear box has multi decade old oil in the sump and it is mounted on a timber sledge. We dragged it down the driveway with the John Deere and will figure out a plan for it at somepoint. Possible use it as a sump pump. It smells of old oil and work.

 

Uploaded on Aug 19, 2010

Antique Myers Water Pump Jaeger Hit and Miss Engine

F.E. Myers Self-Oiling Bulldozer Water Pump. Pumping water using a 2hp Jaeger Hit and Miss Engine

Myers 1909 Pump Restoration

Posted in Uncategorized | Leave a comment

Construction continues

This week, construction has continued quickly – the beams supporting the house are almost completely in on late Friday – Paul was confident they would finish either today or Monday.

The guy from Salem Five was onsite to document progress.  Assuming the Appraiser finally files his report, we should be able to close the loan next week and immediately disperse funds to Paul – which would be huge

Photos from midweek and today below – beefy stuff – notice the size of the brackets!  (which were actually too small and Paul had to create a dado for them to fit – which may or may not have been intentional from the factory in order to create a more smooth line to mount the siding on).

Paul mentioned with the two types of foundation and the two types of roofing systems this house has (regular Deck house and the new Truss system Deck has), the house is one of the more, if not most complicated to work on that he has done – at least in a long while.   The Bank documentation guy was excited to see the house – he said he had not seen a Deck house being built in ages and ages.  People keep saying to me how excited they are to see it – which makes you feel good!

Generally in chronological order

IMG_0360

IMG_0361

IMG_0362

IMG_0363

IMG_0364

IMG_0365

IMG_0858

IMG_0859

IMG_0860

Posted in Construction progress, Deck House project 9961 | Tagged | Leave a comment